Work / monument · infrastructure

Tanzania–Zambia Railway

1970–1975 · 20th century · Also known as TAZARA, TAZARA Railway, Uhuru Railway

The Tanzania–Zambia Railway is a railway of about 1,860 kilometres from Dar es Salaam to Kapiri Mposhi in Zambia, built between 1970 and 1975 with an interest-free loan, engineers and workers from China. It gave landlocked Zambia an outlet to the sea that avoided white-ruled Rhodesia and South Africa, and was then the largest Chinese aid project abroad.

Tanzania–Zambia Railway
Image: Jkan997 · CC BY 3.0 · Wikimedia Commons

Mentioned in 1 profile

See also

Cite this entry
APA
The Epoch Institute. (2026). Tanzania–Zambia Railway. In The Epoch Institute Encyclopedia. https://the-epoch-institute.org/encyclopedia/tanzania-zambia-railway
MLA
“Tanzania–Zambia Railway.” The Epoch Institute Encyclopedia, The Epoch Institute, 2026, https://the-epoch-institute.org/encyclopedia/tanzania-zambia-railway. Accessed .
Chicago
The Epoch Institute. “Tanzania–Zambia Railway.” The Epoch Institute Encyclopedia. 2026. https://the-epoch-institute.org/encyclopedia/tanzania-zambia-railway.
Harvard
The Epoch Institute (2026) ‘Tanzania–Zambia Railway’, The Epoch Institute Encyclopedia. Available at: https://the-epoch-institute.org/encyclopedia/tanzania-zambia-railway (Accessed: ).

Last reviewed October 2026Random entry ↻